Human Resource, Work Pieces, Equipment

<< Click to display table of contents >>

Navigation:  TiCon TS > Time Study > Resources >

Human Resource, Work Pieces, Equipment

For time studies, TiCon4 provides a number of criteria that are relevant for the use of resources and for printed output.

In the tabs Human Resources, Work Pieces, and Equipment, global resources can be used in addition to local resources.

More about this: Local and Global Resources

If the corresponding criteria are filled in for these resources, they are read out when they are used in the corresponding tab. Below is an overview of the individual tabs for the element configurations, criteria, and columns.

Tab

Element configuration

Criteria

Column

Human resources

Personnel number [PNR]

Personnel number

Operator, department, team

Gender [GD]

Gender

Age [AGE]

Age

Tab Human resource of a time study

Tab Human resource of a time study

Tab

Element configuration

Criteria

Column

Work pieces

Substance [MAT]

Substance

Assembly, subassembly, part, drawing, material, feedstock, operating supplies, auxiliary supplies, substance

Condition for input [SS]

Condition for input

Drawing number [DRWNR]

Drawing number

Material number [MATNR]

Material number

Measurements, shapes, weights [MSW]

Dimensions, shapes, weights

Tab Work pieces of a time study

Tab Work pieces of a time study

Tab

Element configuration

Criteria

Column

Equipment

Construction year [BY]

Construction year

Boxes, tool, machine

Equipment no. [WFNR]

Equipment number

Technical data, condition [STATE]

Technical data, condition

Tab Equipment of a time study

Tab Equipment of a time study