Resources

<< Click to display table of contents >>

Navigation:  TiCon TS > Time study >

Resources

The resources in a time study are divided into:

Human resources / person = e.g. operator [OP]

Work pieces = e.g. part [PT]

Equipment = e.g. tool [TL]

Note:

In the Administration in the Element usage tab, it is possible to specify which element configurations are allowed as human resource, work pieces and equipment and can be used.

There is a separate tab where the various resources can be added. By selecting them in the "Ressource" column, these resources can be used further in sections.

Zeitaufnahme_ressource

Context menu with the resources for the time study

TiCon4 enables the central management and use of master data. Human resources, work pieces, or equipment can occur, for example, in time studies as well as in balancings.