<< Click to display table of contents >> Navigation: TiCon TS > Time Study > Resources |
The resources in a time study are divided into:
•Personalressourcen / Mensch = z. B. Werker [OP]
•Arbeitsgegenstände = z. B. Teil [PT]
•Betriebsmittel = z. B. Werkzeug [TL]
Please note: |
In the Administration in the Element usage tab, it is possible to specify which element configurations are allowed as human resource, work pieces and equipment and can be used. |
There is a separate tab for each type of resource, in which the different resources can be added. By selecting them in the Resource column, these resources can be further used in sections.
Context menu with the resources for the time study
TiCon4 ermöglicht die zentrale Verwaltung und Verwendung von Stammdaten. Personalressourcen, Arbeitsgegenstände oder Betriebsmittel können z. B. in Zeitstudien ebenso wie in Abtaktungen vorkommen.