Standard capacity

<< Click to display table of contents >>

Navigation:  TiCon PD > Process Cockpit >

Standard capacity

Regarding the content, the "Standard" tab corresponds to the "Kapazität" tab of a human resource, such as department, team, operator.

Note:

If local human resources or human resources (master data) are used without capacity being entered in the process cockpit, the standard capacity is taken for this human resource. Otherwise, the entries from the "Capacity" tab of the relevant resources are used.

PD_PC_Kapazitaet

For planning, it is possible to enter the capacity for several years. These values are used for the evaluation in the "Resource requirements" tab.

The following values are calculated:

Gross working time

Net working time

As capacity data annual net working times can be recorded and calculated, for example, by entering planned work days, daily work days, vacation days and physical condition. In addition, further details and also time allowances can be stored for an FTE.

The parameters and initial values to be recorded can be defined in the Administration for the respective element configuration in the Capacity tab.