<< Click to display table of contents >> Navigation: Resources > Element Type Human Resource > Capacity |
The Capacity tab exists for all human resources. This allows the possible gross / net working time to be determined separately for each operator. The values of the Capacity tab are evaluated to calculate the resource requirements in the process cockpit in which the corresponding resource is used.
Capacity data of a full-time equivalent (= FTE) can be specified there.
Full-time equivalent is the time value produced by a full time worker (Full time = 100 % activity level) within a comparable time period (Day, Week, Month, Year).
As capacity data annual net working times can be recorded and calculated, for example, by entering planned work days, daily work days, vacation days and physical condition. Furthermore, additional information and also time allowances can be stored for an FTE.
Input of capacity data
Please note: |
The parameters and initial values to be recorded can be predefined, activated, and deactivated in the administration for the respective element configuration in the Capacity tab. |