Evaluation

<< Click to display table of contents >>

Navigation:  TiCon Base > MTM, MTM-1 and MTM-2 Analysis > MTM Analysis > Times >

Evaluation

The evaluation shows a conversion of the analyzed time per unit te into a possible number of pieces that can be produced per minute, per hour or per shift.

Zeitgliederung_Auswertung

Evaluation

Note:

The units / shift is calculated using the shift duration (net) entered in the Workplace organization tab. If the tab is not active, a shift duration of 8 h is assumed.