The evaluation shows a conversion of the analyzed time per unit te into a possible number of pieces that can be produced per minute, per hour or per shift.

Evaluation
Note: |
The units / shift is calculated using the shift duration (net) entered in the Workplace organization tab. If the tab is not active, a shift duration of 8 h is assumed. |