Times

<< Click to display table of contents >>

Navigation:  TiCon Base > MTM, MTM-1 and MTM-2 Analysis > MTM Analysis >

Times

In the Times tab, all times of the analysis are arranged separately and clearly. Within TiCon, the times are always calculated in TMU with an accuracy of 15 decimal places.

Zeitgliederung_01

Times

Using the Refresh button on the ribbon, the sum is calculated across all time types and displayed. During the saving process, the most recent valid sum of the analysis is always recalculated. A manual calculation of the sum via this button is therefore for information purposes only.

The tab Times is divided into the areas described below:

Times

Settings

Evaluation

Allowances

Time Tree

Below the entry fields, there is the option to display a time tree. This provides an overview of the individual connections between the different times.

Zeitenbaum

Display of time tree

The representation as a time structure tree corresponds to REFA Standards.