Times

<< Click to display table of contents >>

Navigation:  Administration > Element Attributes > Element Configurations > Process Element >

Times

Time distribution

This is the default distribution type in the header of newly created elements: The time distribution decides according to which time distribution schema the kinds of time are to be assigned.

hmtoggle_arrow1        The time distribution is differentiated by three types:

Time calculation method

Default for Time calculation method field

Number

This is the default for the field number in the time classification of newly created elements. The times of the element are multiplied by the value of the field "Number".

Parts simultaneously

This is the default of the "Parts simultaneously" field in the time classification of newly created elements. The times of the element are divided by the value of the field "Parts simultaneously".

Quantity

This is the default of the "Quantity" field in the time classification of newly created elements. The time te (time per unit) of the element is multiplied by the value of the field "Quantity".