|
<< Click to display table of contents >> Navigation: Administration > Element Attributes > Allowance Classes > Test Calculation |
The Test calculation tab is used to check whether the standard and distribution times are calculated correctly using the allowance time definitions created in the definition in the Header tab.
The following options are available:
Input fields for time values
All times for which values for calculation can be entered are indicated by a corresponding input field.
Time unit/decimal places
The time units and the decimal places can be selected individually for each time by clicking on the time unit from the respective drop-down selection. By default, the TMU is displayed with 0 decimal places.
Time distribution
When the "Execute" or "Set-up" value is selected, only the times of the selected time distribution are calculated. If "Separate" is selected, all times are calculated.
Quantity / Parts simultaneously / Amount
For test calculations, values for quantity, parts simultaneously, and the amount can also be entered and are then included in the evaluation of the test calculation.
Test Calculation
The test calculation can be executed using the "Test calculation" button in the "Allowance class" ribbon. The standard and allowance times are calculated on the basis of the allowance definition.