<< Click to display table of contents >> Navigation: TiCon PD > Usage of Process Cockpit / Process Design |
Analogous to process elements, process designs can also be applied in process designs, or process designs in a process cockpit, or vice versa. To do this, open the Operations tab and enter either the element code or drag the desired element from the Explorer. The procedure corresponds to the Usage of MTM Analyses.
When inserting a process cockpit or process design in a process cockpit or process design, all resources that do not yet exist in the open element are added and the content of the element is assigned under the corresponding resource. If a resource already exists, the corresponding content of the added element is assigned to the existing resource. The time corresponds only to the share which the inserted element has at the respective resource.
Please note: |
Resource equivalence for global resources means identical ID and for local resources the identical Code / Index / Variant. Local resources without a code are per default never identical. |