Path Evaluation

<< Click to display table of contents >>

Navigation:  TiCon PD > Process Design >

Path Evaluation

The Path evaluation shows the average working time of the modeled process.

When decision shapes are used, there are different ways for the processing - depending on the number of decisions. If a process contains such alternative paths, they are displayed separately with their weighting.

1. Path evaluation without decision shapes

Pfad_ohne_Entscheidungsshape

2. Path evaluation with decision shapes

Pfad_mit_Entscheidungsshape

Hints for the calculation

As time for a process step the total sum of all times, that can be entered in the properties of the shape, is valid.

Time type

Meaning

Average processing time

Considers all paths and their weights, this means after a decision shape the times of the divided paths are multiplied with the percentage rate of the respective path.

Processing time

The processing time is the time, which is given by the sum of all shapes.

Pass time

The pass time is the time, which is required for a pass. It is taken into account that shapes are processed at the same time.

Please note:

The path evaluation is only calculated if the process design is valid.

A process design is only valid when it has a start and an end shape and all shapes in the working area are connected with each other.

Incomplete process designs can be saved, but they are not valid.