Set / Overwrite Value Adding in Structure

<< Click to display table of contents >>

Navigation:  TiCon Base > MTM, MTM-1 and MTM-2 Analysis > MTM Analysis > MTM Analysis - Examples > MTM-Analysis with process indicator "Value Added" >

Set / Overwrite Value Adding in Structure

The structure of the analysis B.M.AB3.03.5 has been evaluated regarding the value adding. B.M.AB3.03.5 is used in C.M.AB3K...5. The corresponding structure line in C.M.AB3K...5 is set to "non-value adding" regarding the value adding. Consequently, the shares of the value adding of B.M.AB3.03.5 are overwritten in C.M.AB3K...5.

Using B.M.AB3.03.5 in C.M.AB3K...5 without assigning a value adding:

PBS_WS_BSP_2

Analysis B.M.AB3.03.5:

PBS_WS_BSP_1

Analysis B.M.AB3.03.5: Structure with value adding and Tab "Value added"

Assignment of the value adding "non-value adding" in structure line of C.M.AB3K...5:

PBS_WS_BSP_4

Allocation of the value adding for the structure element B.M.AB3.03.5 in the structure of the analysis C.M.AB3K...5

Evaluation in the tab "Value added" in C.M.AB3K...5:

PBS_WS_BSP_5

Shares of value added from analysis B.M.AB3.03.5 are overwritten in analysis C.M.AB3K...5